watchooOpen the watchoo map

Dübendorf

Municipality in the canton of Zurich

Construction publications as of 29 Sept 2026.

Open map at the Dübendorf center

watchoo tracks 36 construction publications in Dübendorf, 9 of them published in the last 30 days. 1 objection deadline is still open as of 29 Sept 2026.

Key figures

Construction publications
36
1.4% of the canton
Last 30 days
9

1.7% of the canton

Last 90 days
27

1.5% of the canton

Open deadlines
1

1.1% of the canton

Expiring in 14 days
1

1.4% of the canton

About Dübendorf

Dübendorf ranks 8th of 170 municipalities in the canton of Zurich by construction publications and holds 1.4% of all construction publications in the canton. 9 of them were published in the last 30 days, a higher share than across the canton (25% against 21.2%).

1 objection deadline is still open and expires within 14 days. Most publications fall under BP-ZH / BP-ZH01 (100%). The most common building zone is Kernzone Bahnhofstrasse (K1), Baulinie Verkehr RR, KP Nr. 1 Bahnhofstrasse / Wallisellenstrasse, with 2.8% of the publications.

Recent construction activity

Construction publications per month

  • Jun 20269
  • Jul 202610
  • Aug 20268
  • Sept 20269

Objection deadlines

2 of 36 publications carry an objection deadline; 1 are still open as of 29 Sept 2026.

Open
1
Expiring within 14 days
1
Next deadline
30 Sept 2026

Rubrics

Construction publications by rubric

  • BP-ZH / BP-ZH0136

Rubrics are the official gazette categories of the publications.

Publications by zone

Construction publications by building zone
ZonePublicationsShare
Kernzone Bahnhofstrasse (K1), Baulinie Verkehr RR, KP Nr. 1 Bahnhofstrasse / Wallisellenstrasse12.8%
Wohnzone dreigeschossig (W3), Baulinien Verkehr RR12.8%
Wohnzone dreigeschossig (W3), Baulinien Verkehr VD RR, QP Nr.24 Wasserfurren, ohne Aussteckung12.8%
Wohnzone zweigeschossig (W2a), ohne Aussteckung12.8%
Wohnzone zweigeschossig (W2b), Wald, Baulinien VD, Waldabstandslinie RR, Waldgrenze statisch12.8%
Wohnzone zweigeschossig mit Gewerbeerleichterung (W2c), Baulinie RR12.8%
Zentrumszone 4 Hochbord (Z4), Baulinie Verkehr BD, GP Büelwisen (Teilgebiet I), EP Zentrumszone Hochbord, QP Nr. 41 Hochbord, keine Aussteckung da bereits erstellt12.8%
No zone2980.6%

Zone names are the designations from the notices; many notices name no zone.